Pi

In addition to being eco-friendly, the Pi homes are also econo-friendly. By utilizing energy-efficient materials and insulation, the homes are designed to reduce consumption and lower utility costs.

Pricing starts at:
69 000 €
Designed for up to
2 people
We will personalize the house to meet your requirements.
Details
Ground floor
45 m2
Levels
1
Building area
57 m2
Living area
41,83 m2
Bathrooms
1
Bedrooms
2

Floor plans - Pi Porto

Levels

1
Living room & Kitchennete
19,8 m2
2
Bedroom
13,2 m2
3
Bathroom
4,9 m2
4
Technical room
3,1 m2
=
Sum
41,83 m2
Variants

Multiple models available

Porto

The Porto model features a two-sided gabled roof, which exudes a classic charm. It's perfect for those who appreciate a traditional architectural style.

Faro

Faro showcases a four-sided hipped roof, providing a distinctive and elegant appearance. This option is ideal for homeowners seeking a timeless and refined style.

Lisbon

Lisbon boasts a flat roof, offering a sleek and minimalist aesthetic. This design choice suits those who prefer a modern and clean look.
WHAT ARE OUR DIFFERENTIATORS?

LVNG are extraordinary houses

Our house has been designed with attention to every detail, both technically and visually.

Durability

Our house is built on a galvanized, cold-bent steel structure—proven for durability through wind deflection tests. We confidently offer a 50-year warranty on this element.

Energy saving

Ruukki sandwich panels, UV selective glass, etc. - the materials used give us houses that allow us to approach zero energy balance on an annual basis.

Timeless design

Simple but distinctive solids with glazing with very narrow profiles second to none. These homes not only look good from the outside; staying in them is a pleasure.

Safety

Glazing with P2/P4 class; they have a tempered layer, locking giving burglary protection and are embedded in an aluminum frame. Entrance doors with RC2 class.

Modern facades

Seamed metal cladding and aluminum profiles with woodgrain varnish. To protect the facade we use powder varnish, highly resistant to weather conditions. For the varnish itself we give a 15-year warranty.

Fast construction

Shell & LVNG standard (with installations) we implement in a time frame of 99 days from the time of obtaining a building permit.
Timeline of precision building

Work schedule for the construction of the PI modular house

NO.
Activity performed
Days since signing the contract
Preparation of project documentation and obtaining planning permission
1
Preparation of the architectural and construction project and the Site Development Plan (project documentation for the building permit)
30 days
2
Provision of guidelines for foundations and location of connections
1 day after completion of the project (to be implemented after receipt of planning permission)
Building permit
3
Ordering and prefabrication of modular house components in production halls in Poland
55 days (Day 1-55)
4
Shipping of transports to site and unloading
4 days (Day 56-59)
5
Installation of the superstructure on the prepared foundation
4 days (Day 60-63)
6
Installation of façade, façade ironwork, doors, roof and insulation
10 days (Day 64-73)
7
Installation of interior components (internal walls, sanitary and electrical installations, wall and ceiling finishes)
24 days (Day 74-97)
8
Preparing the building for acceptance and cleaning
1 day (Day 98)
9
Completion of Shell&LVNG phase - handover of the building to the Investor
1 day (Day 99)
Details

Technical specification

Features Included

Shell & Core

Shell & LVNG

Turnkey Cozy

Turnkey Premium

Prices
Construction
Interior
Net Zero Energy / Carbon Neutral
Fitout
Contact

We will build your home, ready to move in.

Call us or

📢 Fill out the form, and we'll prepare a personalized offer just for you! 🏡💡

Get personalized offer 📩

Submit
Success!
We will contact you as soon as possible.
BACK TO HOME
Oops! Something went wrong while submitting the form.